top of page

Dam and Water Resource Level and Volume Monitoring

Maximizing dam and water resource management with advanced level and volume monitoring

  • Enhancing efficiency with near real-time dam and water volume monitoring

  • Promoting proactive resource management with robust IoT technology

  • Utilizing battery-operated sensors for sustainable and reliable monitoring

ellenex.shop.png
ellenex.com.png

Solution

The battery-operated Floating Enclosure attached to a submersible level sensor manufactured by Ellenex leverages NB-IoT technology to address these challenges. This IoT sensor solution consists of Ellenex's wireless submersible level sensor and the floating enclosure.


The benefits of using this approach include:

  1. Near real-time data transmission: The Ellenex sensors transmit data every few hours, providing near real-time information on water levels and volume for better decision-making.

  2. Rugged and reliable: Ellenex's products are built to withstand harsh industrial applications and have an IP68 rating for durability in challenging environments.

  3. Battery-operated and low maintenance: The sensors' long battery life reduces the need for frequent maintenance, saving time and resources.

  4. Enhanced connectivity: The NB-IoT technology allows for better coverage, even in remote locations, ensuring seamless data transmission.

  5. Cost-effective solution: The IoT-enabled approach reduces labor and infrastructure costs, providing an affordable alternative to traditional monitoring methods.


By implementing this solution, authorities can efficiently monitor and manage water levels in dams and other water resources, leading to better water allocation, flood prevention, and overall water resource sustainability.

easytoinstall.png

Easy Install

preconfigured.png

Pre-Configured

secure.png

Secure

quickroi.png

Quick ROI

Dam and Water Resource Level and Volume Monitoring
ruggedised.png

Rugged Design

batteryoperated.png

Battery Operated

The management and control of water resources, especially in dams, require continuous monitoring of water levels and volume. Traditional methods of monitoring are labor-intensive, expensive, and may not provide accurate and up-to-date information. These challenges can lead to ineffective water resource allocation and increased risks of floods or water shortages.

Challenge

Advanced Dam and Water Resource Level Monitoring with Ellenex NB-IoT Floating Enclosure

LM-RD-W-N
Purple Podiums

Effective dam and water resource management is crucial for ensuring the adequate supply of water for agriculture, industry, and domestic use, as well as preventing devastating floods.

Ellenex employs cutting-edge communication technology by utilizing the LTE Cat M1 protocol, which operates on 4G and 5G cellular networks, making it suitable for mobile and stationary monitoring applications. However, its remarkably low power consumption and superior penetration rate, specifically designed for industrial solutions, sets it apart. Narrowband Internet of Things (NB-IoT) and LTE Cat M1 are advanced communication technologies that offer significant advantages for monitoring applications. These technologies provide efficient and reliable connectivity for IoT devices, allowing for seamless communication between our sensor and remote monitoring systems. NB-IoT and LTE Cat M1 are known for their low power consumption, enabling prolonged battery life for the devices, which is crucial for remote or hard-to-reach areas. Moreover, these technologies offer excellent penetration capabilities, allowing for reliable communication even in challenging environments, such as underground or remote locations where devices are often deployed. NB-IoT and LTE Cat M1 also provide secure and scalable connectivity, enabling robust and cost-effective solutions for monitoring applications in various industrial sectors, including agriculture, utilities, logistics, and more.

Technology

Dam and Water Resource Level and Volume Monitoring

Connectivity & Visualisation Platform

ellenex software platform 1.png
  • Encrypted ultra-low power communication protocol

  • Advanced device inventory

  • Integration APIs for enterprise systems

  • Multi-tenant role-based access control

  • Data export and import

  • White-label platform for enterprise runs on private account

  • Variable alarm setting for high and low thresholds and multi-channel alerting

  • Sampling and transmission interval configuration

  • Transmission condition configuration

  • Other configurations and customisation available on request

Ellenex's software platform is a comprehensive and user-friendly solution specifically designed for diesel delivery management. The platform offers a wide range of features tailored for diesel delivery operations, including real-time data visualization, customizable alerts and notifications, historical data analysis, and predictive analytics. It provides users with a holistic view of their diesel delivery assets, allowing them to make data-driven decisions for optimal fuel management. The platform is accessible via web browsers and mobile devices, providing convenient remote access
to critical information anytime, anywhere. Ellenex's software platform is designed with a user-centric approach, offering intuitive navigation and a user-friendly interface for easy setup and configuration. With its advanced features and ease of use, Ellenex's software platform empowers users to effectively monitor and manage their diesel delivery operations in remote areas, ensuring efficient and sustainable fuel resource management.

singleshotvisualisation.png
Single shot data visualisation of devices
location indication.jpg
Asset location indication and complex formula
volume prediction.jpg
Volume calculation and prediction
easy historic data.jpg
Easy historic data analysis
device list map.jpg
Device list visualisation on map
location monitoring.png
Asset location monitoring (for mobile assets)
main-dashboard.png
device-page.png
monitor.png
control.png
alert.png

Ellenex Asset Monitoring App

Integration Options

Ellenex's filter performance monitoring solution sets itself apart with its pre-configured and plug-and-play design, eliminating the complexities of configuration, programming, and connection to the platform. This unique approach ensures that users can start monitoring performance and cleanness of the air filters in the air handling units quickly and easily  without any technical hassles. Additionally, Ellenex offers seamless integratability at both the network and platform levels, allowing for easy integration with any network or visualization/analysis platform. This competitive advantage makes Ellenex's solution highly adaptable and compatible with existing systems, providing users with flexibility and convenience in managing their diesel resources effectively.

Do you want to discuss your application?
Contact us for a customized applications

Please fill out the form to set consultation session with our team and discuss your application.

Thanks for reaching out! We will get back to you as soon as possible.

Upload supportive document
(Max file size of 15MB)
ellenex logo - Industrial Iot Solution
order iot product
ellenex linkedin
ellenex x contact
ellenex youtube
ellenex contact
ellenex facebook
INSTAGRAM ELLENEX

© 2025 Ellenex Corporation 

Don't Settle for Less ...

Supported Networks:

 

​

​

Products:

​

​

​

Industries:

ellenex NB IoT
ellenex lorawan
ellenex satellite
ellenex LTE Cat M1
ellenex wirepas
hvac monitoring
water monitoring
diesel tank monitoring
differential pressure sensor
well monitoring
wireless sensor
ellenex-github
wireless pressure sensor
wireless level
wireless remperature
smart meter
ellenex water quality sensors ph conductivity turbidity dissolved oxygenedited
ellenex IoT moisture rain and humidity sensors
iot product
iot solution
ellenex%20other%20products_edited_edited
  • Air Compressor Operation Monitoring

  • Asset Cathodic Protection Monitoring

  • Asset Temperature Monitoring

  • Boilers Pressure and Temperature Monitoring

  • Building Structural Health Monitoring

  • Chemical Tanks Level Monitoring

  • Data Centre and Clean Room Pressure Monitoring

  • Diesel Delivery Management

  • Differential Pressure Monitoring

  • Dump Truck Overload and Operation Monitoring

  • Dust Collection System Monitoring

  • Farm Fish Operation Monitoring

  • Flood Monitoring

  • Frozen Food Delivery Management

  • Grain Silo Level Monitoring

  • HVAC Air Filter Performance Monitoring

  • HVAC Airflow Monitoring

  • Hydraulic Systems Overload Monitoring

  • Industrial Gas Cylinders Level Monitoring

  • Industrial Water Meters Digitalisation

  • Land Movement Monitoring

  • Liquid Storage Tank Level Monitoring

  • Manhole Blockage Monitoring

  • Milk Tank Level Monitoring

  • Negative Pressure Monitoring

  • Operational System Digitalisation

  • Pipe Temperature and Pressure Monitoring

  • Pump Pressure Monitoring

  • Rain Level Monitoring

  • Remote Diesel Tank Level Monitoring

  • Soil Moisture Monitoring

  • Trucks Overload Monitoring

  • Underground Water Pipeline Pressure Monitoring

  • Waste Liquid Delivery Management

  • Wastewater Pipe Pressure Monitoring

  • Water Filter Performance Monitoring

  • Water Quality Monitoring

  • Water Supply Monitoring

  • Water Tank Level Monitoring

  • Water Wells Level Monitoring

Key pre-configured Industrial IoT solutions

Main Industrial IoT Sensors: 

  • PTS2: Industrial Pressure (0.2bar to 1,000bar)

  • PTC2: Corrosive Resistant Pressure

  • PTD2: Pressure Sensor with Built-in Temperature Sensor

  • PTDH2: High Temperature Pressure and Temperature Sensor

  • PTG2: Pressure with Built-in GPS

  • PTS3: IP68 Pressure Sensor

  • PTF2: Flush Type Pressure Sensor

  • PTF2: Thich film Flush type Pressure

  • PTE2: Earth Pressure Sensor

  • PDS2: Industrial Differential Pressure Sensor

  • PDG2: DP with Built-in GPS

  • PDT2: Ultra Low Range Air Pressure and Temperature

  • PLS2: Submersible Level (1m to 200m range)

  • PLC2: Corrosive Resistant Level (Titanium)

  • PLD2: Level Sensor with Built-in Temperature

  • PLG2: Level Sensor with Built-in GPS

  • PLS3: Submersible Level Sensor with IP68 Housing

  • PLM2: Well Level Sensor (15.8mm Sensor Head, 2in Housing)

  • PLMD2: Well Level and Temperature Sensor

  • TTS2: Industrial Temperature Sensor

  • TTG2: Temperature Sensor with Built-in GPS

  • TTS3: Temperature Sensor with IP68 housing

  • TTS2: Pipe Temperature Sensor

  • DUS3: IP68 Ultrasonic Level Sensor

  • DRC3: IP68 Corrosive Radar Sensor (8m and 30m range)

  • FMS2: Industrial Water Meter Interface

  • CSD2: Conductivity Salinity and Temperature sensor

  • CTR2: Turbidity and Temperature Sensor

  • CPH2: pH, ORP and Temperature Sensor

  • CDO2: Dissolved Oxygen and Temperature Sensor

  • MSS2: Soil Moisture Sensor

  • MAS2: Outdoor Humidity Sensor

  • MRS2: Rain Sensor (Tipping bucket)

  • ECP2: Cathodic Protection Sensor

  • RS1-4/20: Single channel 4-20mA Interface

  • RS1-P: Single channel Pulse Interface

  • RS1-SDI: Single channel SDI-12 Interface

  • RS1-M: Single channel Modbus Interface

  • RS1-Pt: Single channel Pt100 Interface

  • RM1: Multi-channel Interface

  • RM4-4/20: Multi-channel Interface (4 x 4-20mA Sensor)

  • RM4-Pt: Multi-channel Interface (4 x Pt Sensor)

  • RM4-M: Multi-channel Interface (4 x Modbus)

  • RM4-mV: Multi-channel Interface (4 x mV Sensors)

  • RM4-Pulse: Multi-channel Interface (4 x Pulse Counter)

  • RM4-0/10: Multi-channel Interface (4 x 0-10V Sensor)

bottom of page